RocketTheme Joomla Templates
     
Home
Services Print E-mail

Soil Stabilization

In Soil Stabilization applications the preliminary engineering work and mix designs are done by a qualified testing laboratory to determine the appropriate chemical and application rate to achieve the long term performance required to take advantage of the stabilized soil layer in pavement or building pad design.  Depending on soil conditions, the engineer may specify... (Read More)

 

Soil Drying 

In Soil Drying applications the untreated soil is overly wet and the high moisture content is causing problems with handling and meeting compaction requirements.  In these instances, our intended result is to simply reduce the moisture content of the untreated soil bringing it back to within specified tolerances.  Lime products have a tremendous... (Read More)

 

Soil Modification

In Soil Modification applications the untreated soil is considered unsuitable for use in structural applications on a project site.  Most often the only alternative to treating these soils is paying to have them removed, disposed of and replaced with select, imported fill.  This alternative is much less cost effective than treating the material in place. The most effective chemicals in... (Read More)

 

Full-Depth Reclaimation 

Full Depth Reclamation (FDR) is a maintenance process by which the full flexible pavement section consisting of asphalt, base, sub-base and a pre-determined portion of the underlying soil subgrade are uniformly pulverized and blended with a specified type and amount of chemical re-agent such as... (Read More)

 

Asphalt Pulverization

Asphalt Pulverization is a very common application on severely distressed chip & seal county roads, bituminous pavements and parking lots.  Similar to Full Depth Reclamation, Asphalt Pulverization allows for the reuse of the existing asphalt materials instead of wasting them.  Mt. Carmel uses their high powered... (Read More)

 

Bentonite Liners

Commercial and residential developments are frequently incorporating retention ponds to add to the scenic beauty of a finished site.  Typically fine, clayey soils will retain water... (Read More)

 

Frozen Coal Pulverization

During a long and cold winter, many utility companies will run into problems with their coal stockpiles freezing and clumping which causes their material handling systems to plug and can... (Read More)

 

 

SuperSlurry

 

 

 

 

Click here to learn more

Contact Info

1611 College Drive
PO Box 458
Mount Carmel, IL
62863-0458

ph. 618.262.5118
fax 618.263.4084
email This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Newsletter

Last Updated: June 6, 2009

 

View our latest Newsletter here.

Adobe Acrobat Reader required.